POWER LINE CONSTRUCTION & ENGINEERING

Turnkeypower line construction

We erect towers, install and string conductors, and support overhead power line construction for energy and infrastructure projects.

  • Reliable
    solutions
  • Experienced
    team
  • Energy
    for growth
Working across Kazakhstan

About us

Experience that
powers progress.

LEP Expert brings together specialists in power network design, engineering surveys and construction support. Our company was founded in 2020. Our team’s professional experience dates back to 2003.

Projects in the portfolio
77
Maximum voltage
500 kV
Cable lines in the projects
36.9 km
High-voltage power lines crossing a field
Engineering precision.
At every stage.
2003Specialist experience
2020Company established

PORTFOLIO

Power network projects.
From 0.4 to 500 kV.

Company projects and specialists’ experience at design and survey organisations from 2005 to 2026.

01Moyynty — Kyzylzhar railway power supply2025–2026
  • 35 kV2025–2026

    Working design

    Overhead, km
    331.3
  • 110 kV2025–2026

    Working design

    Overhead, km
    325.4
Client
АО "Национальная компания "Қазақстан темір жолы" (КТЖ)
Contractor
ТОО "Expert engineering Ltd" / ТОО "Проект ЭНС"
02Tengiz — GSU: 220 kV cable line2026
  • 220 kV2026

    Working design

    Cable, km
    0.9
Client
ТОО "KMG PETROCHEM"
Contractor
ЛЭП-эксперт инжиниринг /
03RDMC transmission and distribution power lines2025–2026
  • 10 kV2025–2026

    Design / Detailed design

    Overhead, km
    10
  • 35 kV2025–2026

    Design / Detailed design

    Overhead, km
    10
Client
Reko Diq Mining Coompany (RDMC)
Contractor
ТОО "Expert engineering Ltd" / ТОО "PSI group"
04Karakul — Nurabod: 500 kV line design adaptation2025
  • 500 kV2025

    Working design

    Overhead, km
    258
Client
JSC National Electric Grid Of Uzbekistan
Contractor
ЛЭП-эксперт инжиниринг / East West Engineering
05Ulke — Karabatan: 500 kV line2024–2025
  • 500 kV2024–2025

    Working design

    Overhead, km
    577
Client
АО "KEGOC"
Contractor
ТОО "НИЦ-Энергетика" / ТОО "EIS Corporation"
Full project portfolioCollapse portfolioAnother 72 projects · 2005–2026

Company design work and specialists’ professional experience at the organisations listed. Period: 2005–2026.

06Daulet substation: 110 kV line connection2026
  • 110 kV2026

    Working design

    Overhead, km
    13
Client
ГУ «Управление по инвестициям и развитию предпринимательства города Астаны»
Contractor
TOO "Expert engineering Ltd" / ТОО "DP Engineering Grouip" ТОО "KZ PROJECT EXPO-2017"
07L-44, L-161 and L-162 line relocation2026
  • 110 kV2026

    Working design

    Overhead, km
    1
Client
ТОО «Казахстанские коммунальные системы»
Contractor
TOO "Expert engineering Ltd" / ТОО "ЭнергоСервис ЭТЛ"
08L-44: 35 kV line relocation2026
  • 35 kV2026

    Working design

    Overhead, km
    0.6
Client
ТОО «Казахстанские коммунальные системы»
Contractor
TOO "Expert engineering Ltd" / ТОО "ЭнергоСервис ЭТЛ"
09L-2549: 220 kV line relocation2026
  • 220 kV2026

    Working design

    Overhead, km
    0.3
Client
ТОО «Казахстанские коммунальные системы»
Contractor
TOO "Expert engineering Ltd" / ТОО "ЭнергоСервис ЭТЛ"
10Kentau CCGT — Kentau: two overhead lines2026
  • 220 kV2026

    Working design

    Overhead, km
    16
Client
ТОО «Казахстанские коммунальные системы»
Contractor
ЛЭП-эксперт инжиниринг / ТОО "ЭнергоСервис ЭТЛ"
11Kaindy wind farm: 35 kV overhead line2026
  • 35 kV2026

    Working design

    Overhead, km
    12
Client
ТОО "Universal Green Energy Projects"
Contractor
TOO "Expert engineering Ltd"
12Turan wind farm: 35 kV overhead line2026
  • 35 kV2026

    Working design

    Overhead, km
    60
Client
ТОО "Universal Green Energy Projects"
Contractor
TOO "Expert engineering Ltd"
13L-2307: 220 kV line reconstruction2025–2026
  • 220 kV2025–2026

    Working design

    Overhead, km
    61
Client
АО "KEGOC
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Poligram"
14L-3050: 220 kV line reconstruction2025–2026
  • 220 kV2025–2026

    Working design

    Overhead, km
    208
Client
АО "KEGOC"
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Poligramm"
15Zhezkazgan substation: two 220 kV lines2025–2026
  • 220 kV2025–2026

    Working design

    Overhead, km
    23
Client
ГУ "Управление энергетики и жилищно-коммунального хозяйства области Ұлытау"
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Энергосервис ЭТЛ"
16L-2308: 220 kV line reconstruction2025
  • 220 kV2025

    Working design

    Overhead, km
    69
Client
АО "KEGOC"
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Poligramm"
17Line relocation for the Moyynty — Kyzylzhar railway2025
  • 10 kV2025

    Working design

    Overhead, km
    1
  • 35 kV2025

    Working design

    Overhead, km
    3
  • 220 kV2025

    Working design

    Overhead, km
    6
  • 500 kV2025

    Working design

    Overhead, km
    1
Client
АО "Национальная компания "Қазақстан темір жолы" (КТЖ)
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Проект ЭНС"
18Almaty-3 railway station2025
  • 10 kV2025

    Feasibility study

    Overhead, km
    3
Client
Коммунальному государственному учреждению "Управление городской мобильности города Алматы"
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Научно-исследовательский институт транспорта и коммуникации"
19Western zone solar power plant, 20 MW2025
  • 35 kV2025

    Working design

    Overhead, km
    5
Client
ТОО "АКТЮБГЛАВПРОЕКТ"
Contractor
ЛЭП-эксперт инжиниринг
20Zhuzimdik wind farm, 150 MW2025
  • 220 kV2025

    Working design

    Overhead, km
    43
Client
ТОО "New clean energy"
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Энергосервис ЭТЛ"
21Karagan-Ozernaya: 35 kV line reconstruction2025
  • 35 kV2025

    Working design

    Overhead, km
    1.5
Client
ТОО "Караганды Жарык"
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Энергосервис ЭТЛ"
22L-121 and L-122 conductor replacement2025
  • 110 kV2025

    Working design

    Overhead, km
    16
Client
ТОО «Оңтүстік Жарық Транзит»
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Энергосервис ЭТЛ"
23Atameken village utility networks2024–2025
  • 35 kV2024–2025

    Working design

    Overhead, km
    0.7
  • 110 kV2025

    Working design

    Overhead, km
    2
Client
ГУ «Отдел строительства архитектуры и градостроительства Панфиловского района»
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Poligramm"
24Batys — Zapadnaya: 110 kV line2024
  • 110 kV2024

    Working design

    Overhead, km
    13
Client
ГУ «Управление энергетики и жилищно-коммунального хозяйства акимата Костанайской области»
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Энергосервис ЭТЛ"
25Dostyk — Moyynty railway double-tracking2024
  • 35 kV2024

    Working design

    Overhead, km
    3.2
Client
ТОО "Транспроект-К"
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Энерго-РЭМ"
26Compressor station 14 — Kostanay gas pipeline2023–2024
  • 10 kV2023–2024

    Feasibility study

    Overhead, km
    686
  • 35 kV2023–2024

    Feasibility study

    Overhead, km
    26
Client
АО "Интергаз Центральная Азия"
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Научно-исследовательский институт транспорта и коммуникации"
27Turkestan region: 1,000 MW CCGT power plant2023
  • 10 kV2023

    Design

    Cable, km
    4.3
  • 35 kV2023

    Design

    Overhead, km
    4.9
Client
ТОО "ПГУ - Турекстан" (филиал АО "Самрук-Казына")
Contractor
ЛЭП-эксперт инжиниринг / ТОО «Проектный институт «Промстройпроект»
28Dostyk Novaya: 35 kV line2023
  • 35 kV2023

    Detailed design

    Overhead, km
    5.1
Client
ТОО "Энерго-РЭМ"
Contractor
ЛЭП-эксперт инжиниринг
29Shymkent: high-temperature composite-core conductor2023
  • 35 kV2023

    Working design

    Overhead, km
    10.9
Client
ТОО «Оңтүстік Жарық Транзит»
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Энергосервис ЭТЛ"
30Shymkent: 35 kV overhead-to-cable conversion2023
  • 35 kV2023

    Working design

    Overhead, km
    0.2
    Cable, km
    0.2
Client
ТОО «Оңтүстік Жарық Транзит»
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Энергосервис ЭТЛ"
31Water intake pumping station power supply2023
  • 6 kV2023

    Feasibility study

    Overhead, km
    8
    Cable, km
    1.5
Client
ТОО "ПГУ - Турекстан" (филиал АО "Самрук-Казына")
Contractor
ЛЭП-эксперт инжиниринг / АО "Институт" КазНИПИЭнергоПром"
32Shymkent — Turkestan CCGT line2023
  • 220 kV2023

    Feasibility study

    Overhead, km
    16.9
  • 500 kV2023

    Feasibility study

    Overhead, km
    9.6
Client
ТОО "ПГУ - Турекстан" (филиал АО "Самрук-Казына")
Contractor
ЛЭП-эксперт инжиниринг / АО "Институт" КазНИПИЭнергоПром"
33Ferroalloy plant: 500 kV overhead and cable lines2022
  • 500 kV2022

    Working design

    Overhead, km
    4
    Cable, km
    2.5
Client
ТОО «Mineral Product International»
Contractor
ЛЭП-эксперт инжиниринг / ТОО "НИЦ-Энергетика" / АО «Казахский институт нефти и газа»
34Maksut substation and 110 kV line2022
  • 110 kV2022

    Working design

    Overhead, km
    88
    Cable, km
    0.1
Client
АО «БАСТ»
Contractor
ЛЭП-эксперт инжиниринг / ​ТОО "Научно-исследовательский и проектный институт транспорта и коммуникаций"
35North — South transmission: pre-feasibility study2021
  • 220 kV2021

    Pre-feasibility study

    Overhead, km
    1,051
  • 500 kV2021

    Pre-feasibility study

    Overhead, km
    7,751
Client
АО "KEGOC"
Contractor
ЛЭП-эксперт инжиниринг / АУЭС
36Almaty museum permanent power supply2021
  • 0.4 kV2021

    Working design

    Cable, km
    0.3
Client
КГП «Объединение музеев города Алматы Управления культуры города Алматы.
Contractor
ЛЭП-эксперт инжиниринг
37Substation 3: 6 kV overhead-to-cable conversion2021
  • 6 kV2021

    Working design

    Overhead, km
    0.5
    Cable, km
    0.8
Client
ТОО «Оңтүстік Жарық Транзит»
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Энергосервис ЭТЛ"
38L-103 and L-104 overhead-to-cable conversion2021
  • 110 kV2021

    Working design

    Overhead, km
    0.3
    Cable, km
    0.1
Client
ТОО «Оңтүстік Жарық Транзит»
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Энергосервис ЭТЛ"
39Kokshoky facility permanent power supply2020
  • 10 kV2020

    Working design

    Overhead, km
    3
    Cable, km
    0.5
Client
ТОО "Култау и К"
Contractor
ЛЭП-эксперт инжиниринг / Алматы Строй Проект
40KEGOC: 220 kV line reconstruction2020
  • 220 kV2020

    Working design

    Overhead, km
    59.3
Client
АО "KEGOC" Актюбинские МЭС
Contractor
ЛЭП-эксперт инжиниринг / ТОО "Proekt StroyEnergo"
41Ybyrai wind farm, 50 MW2019
  • 35 kV2019

    Working design

    Overhead, km
    16.9
    Cable, km
    2.6
  • 110 kV2019

    Working design

    Overhead, km
    3.5
    Cable, km
    0.6
Client
ТОО «Zhel Electric»
Contractor
ЛЭП-эксперт инжиниринг / АО "Институт" КазНИПИЭнергоПром"
42Tengiz Future Growth Project2016–2018
  • 35 kV2016–2018

    Detailed design

    Overhead, km
    39.7
  • 110 kV2016–2018

    Detailed design

    Overhead, km
    34.3
Client
Tengizchevroil (TCO)
Contractor
КИНГ / KPJV
43Syrymbet mining and metallurgical plant power supply2015
  • 110 kV2015

    Design / Detailed design

    Overhead, km
    25.8
Client
Акимат СКО / АО «Сырымбет»
Contractor
ЭСИ / ТОО "Siemens"
44Korday residential district infrastructure2015
  • 35 kV2015

    Working design

    Overhead, km
    2
Contractor
ЭСИ / ТОО "ПСК Градцентр"
45Astrakhan — Mangyshlak water pipeline: km 667 pump station2012–2015
  • 110 kV2012

    Working design

    Overhead, km
    13.2
  • 110 kV2015

    Working design

    Overhead, km
    13.1
Client
АО "КазТрансОйл"
Contractor
ЭСИ
46Buryl residential district substation and line2014
  • 110 kV2014

    Working design

    Overhead, km
    3.1
    Cable, km
    4.5
Client
Акимат Джамбульской области / ЖРЭК
Contractor
ЭСИ / ТОО "ПСК Градцентр
47Baryskhan residential district power supply2014
  • 110 kV2014

    Working design

    Overhead, km
    0.2
    Cable, km
    3.9
  • 35 kV2014

    Working design

    Overhead, km
    0.7
    Cable, km
    2.2
Client
Акимат Джамбульской области / ЖРЭК
Contractor
ЭСИ / ТОО "ПСК Градцентр
48Semey — Shulbinsk HPP overhead line2014
  • 220 kV2014

    Working design

    Overhead, km
    79
Client
АО "KEGOC"
Contractor
ЭСИ / ТОО "ProektStroyEnergo"
49Compressor station 8 temporary power supply2014
  • 10 kV2014

    Working design

    Overhead, km
    36.5
Contractor
ЭСИ
50Zhezkazgan — Saksaulskaya railway power supply2013
  • 110 kV2013

    Design / Detailed design

    Overhead, km
    376.3
Client
ТОО "АСПМК-519" / КТЖ
Contractor
ЭСИ
51Balkhash thermal power plant off-site facilities2013
  • 6 kV2013

    Design / Detailed design

    Overhead, km
    0.7
  • 10 kV2013

    Design / Detailed design

    Overhead, km
    1.2
  • 35 kV2013

    Design / Detailed design

    Overhead, km
    2
Client
Siemens
Contractor
ЭСИ
52CHP-3 — Pavlodar main oil pump station2012
  • 35 kV2012

    Working design

    Overhead, km
    24
Contractor
ЭСИ / ТОО "Электросервис"
53Akyrtobe — Abdezim overhead line2011
  • 110 kV2011

    Feasibility study / Design / Detailed design

    Overhead, km
    56
  • 35 kV2011

    Feasibility study / Design / Detailed design

    Overhead, km
    28.4
  • 10 kV2011

    Feasibility study / Design / Detailed design

    Overhead, km
    30
Client
ТОО «Луговской конный завод» района им.Т.Рыскулова Жамбылской области
Contractor
ЭСИ / ТОО "Milon Company Group"
54Kara-Su tourism complex utility networks2011
  • 110 kV2011

    Working design

    Overhead, km
    32.5
Contractor
ТОО "ОРГТЕХЭНЕРГОСТРОЙ"
55Atasu — Alashankou pipeline, pump station 112011
  • 110 kV2011

    Design / Detailed design

    Overhead, km
    290
Client
ККТ
Contractor
ЭСИ / CPPE "KAZAKHSTAN" Ltd.
56North Caspian oil spill response base2011
  • 35 kV2011

    Design / Detailed design

    Overhead, km
    13.9
Contractor
АО НИПИ "КАСПИЙМУНАЙГАЗ" АТЫРАУ
57CPC: A-PS-3A and A-PS-4 power supply2009–2011
  • 220 kV2009–2011

    Investment justification / Design / Detailed design

    Overhead, km
    444.4
Client
Каспийский Трубопроводный Консорциум (КТК)
Contractor
ЭСИ / АО "КАЗАХСКИЙ ИНСТИТУТ НЕФТИ И ГАЗА" (КИНГ)
58Kazzinc: 110 kV line relocation2010
  • 110 kV2010

    Working design

    Overhead, km
    0.4
Client
ТОО "Казцинк"
Contractor
ЭСИ
59Dushanbe — Chanak road tunnel power supply2009
  • 220 kV2009

    Investment justification / Design / Detailed design

    Overhead, km
    33.6
Client
ТОО "АСПМК-519"
Contractor
Энерго-РЭМ
60Taraz wastewater treatment plant power supply2009
  • 110 kV2009

    Design

    Overhead, km
    48.6
Contractor
ЭСИ
61Shokterek metallurgical products plant2009
  • 110 kV2009

    Design

    Overhead, km
    0.4
Contractor
ЭСИ / ТОО "КурАл групп"
62Uranenergo consumer power supply2009
  • 110 kV2009

    Detailed design

    Overhead, km
    381.5
  • 220 kV2009

    Detailed design

    Overhead, km
    11.4
Client
ТОО «Уранэнерго»
Contractor
Энерго-РЭМ / ТОО "Электросервис"
63Ekibastuz metalware plant power supply2008
  • 110 kV2008

    Design / Detailed design

    Overhead, km
    2.5
Contractor
Энерго-РЭМ
64SKZ-U sulphuric acid plant power supply2008
  • 35 kV2008

    Design / Detailed design

    Overhead, km
    8.8
Client
СКЗ-U
Contractor
Энерго-РЭМ
65Kharasan-2 mine power supply2008
  • 10 kV2008

    Detailed design

    Overhead, km
    6.4
Client
Уранэнерго
Contractor
Энерго-РЭМ
66Shymbulak ski resort2007
  • 10 kV2007

    Working design

    Overhead, km
    To be confirmed
    Cable, km
    8.9
Client
ГК "Шымбулак"
Contractor
Энерго-РЭМ
67Shaimerden mine line and substation2007
  • 110 kV2007

    Detailed design

    Overhead, km
    10.9
Contractor
Энерго-РЭМ / ТОО СКРП"Тер & Recle"
68Akshabulak — Aksay — Nuraly 1 line2007
  • 110 kV2007

    Design / Detailed design

    Overhead, km
    93.2
Contractor
Энерго-РЭМ
69Karakuduk oilfield power supply reconstruction2007
  • 35 kV2007

    Design / Detailed design

    Overhead, km
    57.3
  • 110 kV2007

    Design / Detailed design

    Overhead, km
    1.1
Client
ТОО "Каракудукмунай"
Contractor
Энерго-РЭМ
70Medeu sports complex power supply2007
  • 35 kV2007

    Working design

    Overhead, km
    0.6
  • 110 kV2007

    Working design

    Overhead, km
    0.6
Client
Спорт комплекс «Медео»
Contractor
Энерго-РЭМ
71Budenovskoye-2 mine: 10 kV overhead line2007
  • 10 kV2007

    Detailed design

    Overhead, km
    49
Client
Уранэнерго
Contractor
Энерго-РЭМ
72Makat — Kandyagash railway power supply2006
  • 220 kV2006

    Detailed design

    Overhead, km
    1,005.2
Client
ТОО "АСПМК-519" / АО "КТЖ"
Contractor
Энерго-РЭМ
73Atyrau metal rolling plant power supply2006
  • 110 kV2006

    Working design

    Overhead, km
    10.1
Client
ТОО "Атырауский металлопрокатный завод"
Contractor
Энерго-РЭМ
74110 kV line relocation from a development site2006
  • 110 kV2006

    Working design

    Overhead, km
    0.6
Contractor
Энерго-РЭМ
75Kenkiyak — Kumkol oil pipeline2006
  • 10 kV2006

    Detailed design

    Overhead, km
    330
    Cable, km
    3
Client
ККТ
Contractor
Энерго-РЭМ / CPPE "KAZAKHSTAN" Ltd.
76Koktuma substation reconstruction2005
  • 35 kV2005

    Detailed design

    Overhead, km
    0.5
Client
АО "КазТрансОйл"
Contractor
Энерго-РЭМ
77Aktogay — Dostyk: 10 kV overhead line2005
  • 10 kV2005

    Detailed design

    Overhead, km
    305
Client
ТОО "АСПМК-519" / КТЖ
Contractor
Энерго-РЭМ

03 / SERVICES

Engineering solutions.
One connected map.

From initial surveys to construction support. Select an object to explore how we can help your project.

Illustrated power infrastructure with overhead lines, cable routes, a substation, surveyors and an engineering team
06

Infrastructure, in detail.

Six disciplines connected by one goal: a reliable power supply system.

Select an object on the map

04 / PROJECT ESTIMATE

From specifications
to project cost.

Enter your line specifications to receive an itemized design work estimate.

Power line

What are we designing?

Choose the line type, voltage and route length.

Choose the voltage first
Conditions

Design conditions

These parameters affect the scope and cost of design work.

Which category applies?

Category I: flat terrain, ravines, swamps up to 2 m deep; undeveloped urban, industrial and settlement areas.

Category II: mountainous terrain with slopes above 0.1; swamps deeper than 2 m, loose sands; developed urban, industrial and settlement areas.

Project requirements

Contacts

Who is the estimate for?

Enter the client organisation and contact details for this project.

An estimate copy by email

Automatic email delivery is not connected yet. You can print the completed estimate or save it as a PDF.

Need help with the specifications?

Have the line voltage and length ready for an accurate estimate. For a substation or a non-standard project, request a tailored commercial proposal.

FROM BRIEF TO DELIVERY

How we work

Four clear steps from your first enquiry to a completed design.

  1. Start of power line tower assembly: foundations and the lowest section

    Discuss the brief

    We clarify the site, requirements and initial data, and identify the solutions your project needs.

  2. Power line tower with lower and middle sections assembled

    Prepare a proposal

    We agree on the scope, cost and schedule, and record the terms in a contract.

  3. Power line tower with the full shaft and first crossarm

    Develop the design

    We perform the calculations and prepare design documentation to the agreed technical brief.

  4. Completed power line tower with crossarms and insulators

    Deliver the result

    We hand over the documentation package and answer questions about the completed design.

FROM AN ESTIMATE TO YOUR PROJECT

Request a commercial proposal

Get a detailed proposal for power line and substation design. We calculate the design fee in accordance with the regulatory and technical documentation of the Republic of Kazakhstan.

For tender preparation and participation, budget planning and assessing design costs.

1
working dayto prepare your proposal

WHO WE WORK WITH

Our clients

Projects for energy, industry and infrastructure.

Request a proposal

Tell us about your project

Leave your contact details and project information. We will prepare a proposal within one working day. If more information is needed, we will contact you to clarify it.

Contact us

Version dated 29 September 2026

Privacy and data processing

Who processes your data

Operator: LEP-expert engineering, individual entrepreneur, IIN (BIN) 870502301601. Address: 95 Potanin Street, Almaty, Republic of Kazakhstan. Data enquiries and withdrawal of consent: lepexpertengineering@gmail.com, +7 (771) 459-76-96.

Data and purposes

We process the name, phone number, email, company name, project information and calculation parameters you provide to respond to your enquiry, prepare a proposal or PDF estimate and agree the scope of work. Referral sources, campaign tags and technical request information are also used to attribute enquiries and prevent spam. The news and offers subscription is described below.

Consent and disclosure

By checking the box and submitting the form, you consent to collection, recording, storage, use and transfer of the listed data for these purposes. Enquiries are sent to company staff by email, including Gmail (Google). Data may be transferred to hosting and email providers for this purpose, including cross-border transfers when foreign services are used. Your data is not intended for public disclosure.

News and offers subscription

By selecting the checkbox for personal data processing and email updates and submitting the form, you consent to processing your name, email, phone, company and enquiry details, and to receiving LEP Expert news, offers and marketing emails. The checkbox is not preselected. After the enquiry is validated and saved, the subscription becomes active automatically without separate address confirmation. The estimate email or enquiry receipt includes a subscription notice and unsubscribe link. Data is stored in a private database on the website server. We record the date, source, IP address and consent version. The subscription remains active until withdrawn. Every marketing email includes an unsubscribe link. Unsubscribed addresses are excluded from future campaigns; a minimal suppression record is retained to prevent resubscription without new consent. Contact the operator to request correction or deletion. Existing contacts without consent are not automatically subscribed.

Duration and your rights

Consent remains valid until the enquiry purpose is fulfilled or consent is withdrawn, unless a different retention period is required by law. You may contact the operator to request processing information, correction or deletion and to withdraw consent. Include the contact details used for your enquiry. Processing ceases in accordance with the procedure and time limits of Kazakhstan law, subject to any lawful grounds for continued retention.

Storage and security

Access to enquiries is provided to people involved in handling them. The operator arranges data storage and protection in accordance with Kazakhstan law. Contact details are not included in public estimate links. Calculator inputs may be stored temporarily in this browser tab so you can return to your estimate; proposal form entries remain until the page is closed or reloaded.

Maps and analytics

The Yandex map loads only after you select “Show map”. The service receives technical connection data and applies its own policy. When site analytics is enabled, non-identifying interaction events may be processed; contact field contents are not sent in these events.

ЛЭП ЭКСПЕРТ

Let’s discuss your project

Tell us about your requirements, site location and schedule. Choose how you would like to get in touch.

Call us+7 (771) 459-76-96 Send an emaillepexpertengineering@gmail.com
Message on WhatsApp